Before Using Reference Data Synchronization Manager - Intergraph Smart Engineering Manager - Help - Hexagon

Reference Data Synchronization Manager Help

Language
English
Product
Intergraph Smart Engineering Manager
Search by Category
Help
Smart Engineering Manager Version
7.2 (2014 R2)

Always perform the following steps at the target plant before synchronizing reference data.

  1. Back up the plant.

  2. Check available memory. We recommend approximately 150 MB RAM.

  3. Copy the RDS package to a local drive with at least 40 MB of free disk space.

  4. Close all applications (SmartPlant Engineering Manager, SmartPlant P&ID, or SmartPlant Electrical) connected to the plant.

Assumptions and Dependencies

  • The target plant hierarchy must match the source plant hierarchy.

  • Data dictionary versions for each corresponding schema must match.

  • The version of the RDS package must match the version of the RDS Manager software.

  • The Compare process must complete successfully before merging can begin.

  • The RDS Manager does not synchronize validation programs.