Upgrade Plants with the Batch Upgrade Command - Intergraph Smart Engineering Manager - Installation & Upgrade - Intergraph

Intergraph SmartPlant Engineering Manager Upgrade Utility Help

Language
English
Product
Intergraph Smart Engineering Manager
Search by Category
Installation & Upgrade
Smart Electrical Version
2015 R1 (7.1)
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)

This procedure explains how to upgrade two or more plants and their associated applications at the same time.

  1. In the Plant to Upgrade pane select two or more plants that need to be upgraded.

  2. Do one of the following:

    • From the menu commands, click Upgrade > Batch Upgrade.

    • Right-click and on the shortcut menu, click Batch Upgrade.

For a list of all changes made during the batch upgrade, including the upgrade sub-tasks for each plant, see the batch upgrade log files. The log files, named BatchUpgradeV600_site name.log and BatchUpgradeV600_Details_site name.log, are saved in the folder where the .ini file resides.