Upgrading Sites, Plants, and Applications - Intergraph Smart Engineering Manager - Installation & Upgrade - Intergraph

Intergraph SmartPlant Engineering Manager Installation and Upgrade

Language
English
Product
Intergraph Smart Engineering Manager
Search by Category
Installation & Upgrade
SmartPlant Foundation / SDx Version
Smart Electrical Version
2015 R1 (7.1)
Smart Instrumentation Version
(none)
Smart P&ID Version
7.1 (2014 R1)
Smart Engineering Manager Version
7.2 (2014 R2)

You update your site if needed using SmartPlant Engineering Manager.

Before using the new version of the software, we strongly recommend that you completely upgrade your plant and applications as described in this section. For SmartPlant P&ID, you should update all drawings to the current version. A plant with a mixture of upgraded and non-upgraded data may result in some data being permanently inaccessible.

You use the SmartPlant Engineering Manager Upgrade Utility to upgrade the plant and application databases to the latest version of the SmartPlant software.

The following table is a compatibility matrix of the most recent software versions.

SmartPlant Engineering Manager

SmartPlant P&ID

SmartPlant Electrical

Version 2009

Version 2009

Version 2009

Version 2009 SP1

Version 2009

Version 2009 SP1

Version 2009 SP2

Version 2009 SP1

Version 2009 SP2

Version 2009 SP3

Version 2009 SP2

Version 2009 SP2 HF4

Version 2009 SP4

Version 2009 SP3

Version 2009 SP3

Version 2009 SP5

Version 2009 SP4

Version 2009 SP3, SP4

Version 2009 SP6

Version 2009 SP4, SP5

Version 2009 SP5

Version 2014

Version 2014

Version 2009 SP5

Version 2014 R1

Version 2014 R1

Version 2015

Version 2014 R2

Version 2014 R1

Version 2015 R1

Upgrade Requirements at Different Levels

The following table will help you to determine what to upgrade when working with SmartPlant Engineering Manager 2014 R2.

Level

Versions Requiring Upgrade

Site

SmartPlant Engineering Manager versions earlier than 2009 SP3

Plant

SmartPlant Engineering Manager versions earlier than 2009

Application

  • SmartPlant P&ID versions earlier than 2014

  • SmartPlant Electrical versions earlier than 2015 R1

  • Before upgrading your plants, ensure that your site is up-to-date.

  • You are not required to upgrade all plants in a particular site at the same time.

  • If you are upgrading from SmartPlant Engineering Manager 2007.x to 2014 R2, you must first install SmartPlant Engineering Manager 2009 on Windows XP and perform the upgrade from 2007.x to 2009 (including plant and application upgrades). After that, you need to upgrade the operating system to Windows 7, Windows 8, or Windows Server 2012 and then you must uninstall SmartPlant Engineering Manager 2009 prior to installing SmartPlant Engineering Manager 2014 R2.

  • If you are upgrading from a database version of SmartPlant P&ID or SmartPlant Electrical earlier than 2009, you must first upgrade that database version to SmartPlant P&ID or SmartPlant Electrical 2009 using Version 2009 of the Upgrade Utility before upgrading to the current version of the application.

Upgrading Plants and Applications Containing Projects

Running the Upgrade Utility on a plant and applications containing projects upgrades the relevant project schemas at the same time.  Each of the upgrade tasks handles any necessary changes in both the plant or application databases and the project databases.

Upgrading Satellites in a Workshare Collaboration

You do not have to collapse or shut down projects or satellites in Workshare collaborations before upgrading.  Upgrading a satellite is a separate process.  The host for a connected satellite must be upgraded before the satellite.