Scenario: In your Plant, there is a plan to construct a new tank farm area. Before constructing the tank farm, the Design team needs to create a 3D design model of the tank farm for construction, extracting reports, isometrics, procurement, operation and maintenance purposes. The Design team creates the designs in CADWorx software. This is possible when they have the required specifications. These specifications can be created and maintained in SRD, which can be exported to CADWorx reference data format. |