Click Integration > Smart 3D > Smart 3D Transfer Jobs.
-
Click the Transfer Jobs tab.
-
In the Smart 3D Job Definition grid, click New .
-
Enter the mandatory values, which are shown in bold in the picture below.
You can set the Transfer to Production option to Yes to indicate that the export job is a transfer job from a test destination to a production destination. The test destination acts as the data source, and the production destination acts as the destination. Only the differences between the test destination data and the production destination data go into the bulk load.
-
Click Save to save the export job.