Sales Machining Window-Based Work Phases (only in SSC) - Intergraph Smart Production - Help - Hexagon

Intergraph Smart Production Worktime Calculation

Language
English
Product
Intergraph Smart Production
Search by Category
Help

The Sales application contains the Machining window, where values for turning (flanges), hole drilling, milling, press brake, and beveling are given.

Machining time calculation values are given in the System Settings application under the Sales Machining Calculation tabs. Simplified calculation rules enable salespeople to provide starting values and accurate time estimates. If more exact calculation is needed, then work preparation requires using another application and its associated time values.

The post fixes below define the origin of the calculation value:

  • OR - Order

  • OI - Order Item

  • C - Constant value

  • TA - Turning Allowances

  • TSP - Turning Setup Times

  • TS - Turning Speeds

  • DP - Drilling parameters