Pre-blasting - Intergraph Smart Production - 20 - Help - Hexagon

Intergraph Smart Production System Settings

Language
English
Product
Intergraph Smart Production
Search by Category
Help

Blasting type comes from the Quotation/Order item for Pre-blasting or Blasting. The pre-blasting work load is measured in time. Cost calculation in the Sales application uses part or material weight.

Time calculation for Plate Parts, material blasting before cutting:

Work Time =

Blasting Base Time (C) *
(Part Square Area (OI) / Material Plate Area (OI))

Cost weight calculation for Plate Parts, material blasting before cutting:

When part is nested:

Cost Weight =

Part Net Weight * 100 / Nesting-%

When part is not nested:

Cost Weight =

Part Square Weight

Time calculation for Plate Material:

Work Time =

Blasting Base Time (C)

Cost weight calculation for Plate Material:

Cost Weight =

Plate material article weight

Time calculation for Profile Parts, material blasting before sawing:

Work Time =

Blasting Base Time (C) *
(Part length (OI) / Material Profile Length (OI))

Cost weight calculation for Profile Parts, material blasting before sawing:

Cost Weight =

Part Net Weight

Time calculation for Profile Material:

Work Time =

Blasting Base Time (C)

Cost weight calculation for Profile Material:

Cost Weight =

Profile material article weight