In addition to the work phases described in this document, the system has ready-made calculation or constant value-based pricing rules for the following work phases:
-
Charge No External
-
Charge No Internal
-
Geometry
-
Nesting
-
Material picking
-
Grinding
-
Packing
-
Subcontracting
-
Measurement
-
Manual bevel
-
Mechanical Bevel
-
Pre-blasting
-
Blasting
-
Straightening
-
Straightening Setup
-
Turning (Flanges)
-
Drilling
-
Milling
-
Bending (Press brake)
-
Freight
These and other cutting work time calculations are described in detail in SHARED Work Phase Time Calculation (only in SSC).