Plate Parts Work Planning - Intergraph Smart Production - Help

Intergraph Smart Production Sales

Language
English
Product
Intergraph Smart Production
Subproduct
Sales
Search by Category
Help

Click Machining above the position list to display the work planning window. If you select several position lines, the software saves the values for all those lines.

The window consists of five different phases:

Turning

This option is used in flange-turning in which the round flange, which is cut off from a plate, is turned on the inner and outer surface as well as on the planes. For the time calculation of the turning, there are speed tables.

Milling

Because of the complexity of the work phase, there are no calculation rules for milling. You must manually calculate the time.

Drilling

The count, diameter, and the possible thread pitch of the holes are given. Drilling is regarded as the through-drilling in which the drilling length is equal to the plate thickness to which the value calculated from the drilling-hole is added. For the time calculation of the drilling there are speed tables.

Press brake

The number of pressings and the possible part turns related to different axes are given. For the time calculation of the press brake, there are speed tables.

Beveling

The data needed in the part beveling is given. The bevels are made manually in the workshop; the bevels included in the cutter path are included to the cutter path time. For the time calculation of the beveling, there are speed tables. Beveling data can also be given as a list, in which case instead of separate fields there is a list.