Material picking lists created in the Work Queue module are presented in Workshop Picking. The picklist tells which material is required for which work place and when. The material deliveries are reported in the workshop. Getting material to production on time is a key factor for the whole workshop operation and keeping on schedule.
Users can add heat numbers to material in picking. If the material is being sold (not going to cutting), the heat number is mandatory if it was not defined already when the material was received on site.
For more information, see the Workshop Material Picking manual.