Change Gapping Priority - Intergraph Smart P&ID - Help - Intergraph

Intergraph Smart P&ID Options Manager Help

Language
English
Product
Intergraph Smart P&ID
Subproduct
Options Manager
Search by Category
Help
Smart P&ID Version
9 (2019)
Smart Engineering Manager Version
10 (2019)
  1. Select Gapping PPM All Outputs Graphic.

  2. Select the Line Type row with the priority you want to modify.

  3. Select Move Item Up PPM All Outputs Graphic or Move Item Down PPM All Outputs Graphic to move the selected row.

  • The higher a line type is in the Gapping list, the higher its priority.  When two lines intersect, the software makes a gap in the line type with the lower priority.

  • When changing the priority of gapping, you can move only one gap row at a time.