Generate reports for the selected drawings - Intergraph Smart P&ID - 11 - Help - Intergraph

Intergraph Smart P&ID Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
Smart P&ID Version
11
Smart Engineering Manager Version
12
SmartSketch Version
11

Before running any Line List report, verify that every line in the selection has an Item Tag.

  1. In the Engineering Data Editor, select Plant Item from the list.

  2. Select the arrow beside the View menu button and from the menu list, select Edit View.

    PPM All Outputs Graphic

  3. Select Advanced.

  4. Under Edit, from the Property list, select Rep Drawing Name.

  5. From the Operator list, select =.

  6. In the Value box, type <Drawing name 1>.

  7. For additional drawings, enter Rep Drawing Name = <Drawing name 2>, and so forth. For multiple entries for drawing names, be sure to select Match any.

  • When generating a report, the software displays all report templates with unique names. If there are templates with same names but different formats (.xlsm and .xls), the software displays only one of the templates based on your Excel version: *.xlsm for Excel 2007 or a newer version and *.xls for older versions of Excel.

  • All the generated reports are stored in the C:\Users\[username]\My Reports\Output folder. Replace [username] with actual username.

  • For plants with projects, the software includes plant name in the Excel report in <Plant name>!<Project name> format. For example, if the plant name is ACPL and the associated project name is GC-EXP-001, then it would appear as ACPL!GC-EXP-001 in the report.

  • For details of how to generate an Inconsistency Report, see Generate an Inconsistency Report.