Allows you to refresh the active drawing with data from another version of the drawing. The differences display in what is known as a change group. If you accept the changes, the drawing refreshes to display the changes.
To refresh a project drawing, you use the drawing in the plant. hange groups are marked if it affects items you have claimed. Be sure to refresh all of the changes that do not involve claimed items because these are the changes that have been checked in by other projects. You want to include these changes in your drawing so they will not be lost when you perform a check in.