Save a Version of a Drawing - Intergraph Smart P&ID - 11 - Help - Hexagon

Intergraph Smart P&ID Drawing Manager

Language
English
Product
Intergraph Smart P&ID
Subproduct
Drawing Manager
Search by Category
Help
Smart P&ID Version
11
  1. In the List view, select a drawing.

  2. Select Revisions > New Version or select New Version PPM All Outputs Graphic.

  3. On the New Version dialog, enter any comments that you want to attach to the new version.

  4. Select OK to create the version.

  • Select View Log on the Creating Version of Drawings dialog to open the log file and review notes on the version creation operation.

  • New Version skips open drawings, notes them in the log, and then continues.

  • If no changes have been made to the drawing since the last version was created, no new version is created.

  • When a drawing is checked in to the Plant, all versions are deleted from the project.

  • When a drawing version is created, it is stored in a database segment named LOBSEGMENT. This space is not reclaimed when drawing versions are deleted. However, if you delete the older version of a drawing before creating a new version, then the database size will not increase rapidly. Deleting older version will create free space in LOBSEGMENT (without decreasing the total LOBSEGMENT size) which will be available for storing future drawing versions.

  • Use the Schedule button to create a task for creating drawing versions at a later time or on a regular interval. Follow the instructions on the Schedule Task Wizard (for details, see Scheduling Tasks).