-
On the Home page, click Bill of Materials> Maintain BOM.
-
In the BOM Configuration section, select Add Row to add positions to a BOM node.
-
Type a unique number in the Position cell and then select the Issue Status, List Status, Unit and Item Type from their respective lists.
-
Enter the quantity in the Quantity cell.
-
When you create a new BOM position, the position number is set automatically, based on the ZB_LPSTART (first position number of a node) and ZB_LP_INC (position number increment) project defaults.
-
If the ZB_QTY_NEG project default is set to Y, negative quantities can be entered. If you create a position with a Tag number (item type TWM or TOM) and the ZB_TAGQTY project default is set to Y, the quantity must be set to 1.
-
If a unit is assigned to the ZB_UNIT_ID project default, this unit is set by default when creating a new position.
-
If a list status is assigned to the ZB_LST_ID project default, this list status is set automatically when creating a new BOM position.
-
If the ZB_PCKMAIN project default is set to Y and you select an item type with item rule TMS, TOM, TFM, or REF (tagged item), you can create sub-positions with the same item type.