This project default specifies whether you want to allow free BOM structures or not. It is sometimes also called the BOM hierarchy. It determines if the structure of the Work Breakdown Structure on the Requisitions> Maintain Requisitions page must have a hierarchy or not.
-
Module(s) affected by this setting: Maintain BOM, Position Details, Advanced Search, Search Results, Procedures/Macros, and BOM Procedures/Macros Logs.
-
List of Values: Y (default) and N.
-
If set to Y, the project default ensures that a node for isometric drawings should be created below a node for a line. This hierarchy is controlled on the Setup > Node-Type Hierarchy page.
-