Project Defaults - Intergraph Smart Materials - 10.2 - Help - Hexagon

Intergraph Smart Materials Web Help (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Web
Search by Category
Help
Smart Materials/Smart Reference Data Version
10.2

The project defaults that are relevant to the Documentation module are listed below.

  • ZI_DOC_IN - DB server path for the documentation import. This project default corresponds with the DBA setting DOC_IMPORT_PATH.

  • ZI_WEB_DOC - Virtual directory for documents in the web environment.

  • ZI_WEB_TT - Virtual directory for text and terms in the web environment.

  • ZX_DOC_CIP - With this project default, you can control whether the standard procedure or a CIP procedure is used when you click Upload or Open. By default, the standard code is used. If you want to use the CIP functionality, you must set the project default to Y and modify the CIP procedures upload_document and open_document in the mar_custom library. When the CIP feature is activated, the table m_used_files is used to temporarily store the file to be uploaded. The CIP then loads the file to a directory, a share, or other applicable location. The STATUS_CODE field is available on table m_used_files to store the success or the failure of the upload. It is a numeric field. If it contains the value 0, the upload operation was successful, and the Source Path and File Name fields are set. If any value other than 0 is returned, these fields are not filled. Regardless of whether the upload was successful or not, the message that is returned by the CIP appears. After a successful upload of the file, the record in m_used_files can be deleted; the standard procedure does not need this record to work properly. When working with the CIP feature and the open_document procedure, a message only appears if the CIP returns a value.

  • ZX_DOC_CLS - If this project default is set to Y, the document code is generated automatically based on the document class.

  • ZX_DOC_SET - Default document set used by the supplier login, where it will be queried automatically when the Document Sets page is called.

  • ZX_DO_ORD - Select N for numbers or L for letters as the document revision order on the Documents page.

  • ZX_PROJ_PG – If this project default is set to Y, data from the project and product group is displayed on the Notes page. If it is set to N, only data from the project is displayed.

For more information, read Smart Materials Project Defaults .