Whats's new in HxGN SMAT Connector for Jovix - Intergraph Smart Materials - Version 10.3 - Release Notes/Bulletin - Hexagon

Intergraph Smart Materials Release Bulletin (10.3)

Language
English
Product
Intergraph Smart Materials
Search by Category
Release Notes/Bulletin
Smart Materials/Smart Reference Data Version
10.3

Smart Materials Jovix integration is newly introduced. For more information see HxGN SMAT Connector for Jovix

Smart Materials Jovix integration is available with some specific features from our 10.2 SP8 setup only. For details, contact our support team.

  • Implementation of transfer of Purchase Orders, line items, and item-shipments from Smart Materials to Jovix. (CR-MA85421/3136516)

  • Implement syncing of split Item-shipments in Jovix Supplier when the PO Ownership is transferred from Jovix or recalled by Expediter in Smart Materials. (CR- MA85426/3136715, CR-MA85632/3149483, CR-MA85634/3149547)

  • Implement batch transfer of Release Notes from Smart Materials to Jovix. (CR-MA85431/3136858, CR-MA86257/3179499)

  • Sync Packages (Containers) from Jovix to Smart Materials when the RN Ownership is transferred from Jovix or when the RN Ownership is recalled by the Traffic Coordinator in Smart Materials. (CR-MA85433/3136893, CR-MA85635/3149574, CR-MA85636/3149578)

  • Implement transfer of MIRs (MIR by BOM and MIR by Reservation) that are approved but not posted, from Smart Materials to Jovix. (CR-MA86258/3179500)

  • Implement transfer of warehouses from Smart Materials to Jovix. (CR-MA86259/3179501)

  • Implement transfer of MRR by PO and MRR by RN from Jovix to Smart Materials. (CR-MA86260/3179504)

  • Implement transfer of MTRs from Jovix to Smart Materials. (CR-MA86261/3179505)

  • Sync PT Complete Qty (issue quantity) from Jovix to Smart Materials for Picklists (MIRs) that have been integrated from Smart Materials to Jovix.

    Post the MIRs once the sync is complete. (CR-MA86262/3179506)

  • Implement configuration settings for transfer of data between Smart Materials and Jovix and from Jovix to Smart Materials. (CR-MA86264/3179508)

  • Implement a queue mechanism for transfer of data from Smart Materials to Jovix to reduce consumption of resources. (CR-MA86265/3179509)

  • Implement transfer of RTI (Material Return) from Jovix to Smart Materials. (CR-MA86267/3179511)

  • Create a CIP for validating a PO when it is reverse approved in Smart Materials, whether to Delete (Rev=0) or Update (Rev>0) a PO in Jovix. (CR-MA86895/3218130)

  • Implement Direct MRR from Jovix to Smart Materials. (CR-MA86896/3218145)

  • Implement transfer of existing warehouses from Smart Materials to Jovix. (CR-MA86897/3218154)

  • Create a project default to handle transfer of PO data from Smart Materials to Jovix with ownership mechanism. (CR-MA86898/3218182, CR-MA89169/3368129)

  • Push PO details along with RN if the PO details were not pushed earlier. (CR-MA87598/3258652)

  • Update tag number in Jovix catalogs if its value is modified in Smart Materials Purchase Orders. (CR-MA87763/3266429)

  • Enhance MIR workflow to:

    • Include change of status of Pick List in MIR to In progress.

    • Update notes with cause of failure (in-case of failure).

    Validate over-issue warehouse against the company in the MIR. (CR-MA87764/3266540)

  • Implement Jovix Integration Report in Smart Materials Web UI to show the Integration status and to re-sync data. (CR-MA88617/3332674)

  • Packages created for Release Note items must not be deleted on RN Reverse Approve. (CR-MA88626/3333482)

  • Implement Azure Service Bus Receiver console application to receive events from Jovix via Azure Service Bus. (CR-MA88795/3346693)

  • Implement project defaults to configure and communicate Azure Service Bus details. (CR-MA88796/3346695)

  • Implement DBA setting to turn-on or turn-off integration between Smart Materials and Jovix. (CR-MA88874/3351235)

  • Push the split tags that are created by Expediter to Jovix in Shipment details as Split item code and Split item code description. (CR-MA89219/3374202)

  • Physical count sheet integration from Smart Materials to Jovix. (3546174)

  • Update comments for all events in Jovix integration report. (3691923)

  • Additional Fields (Pred Ship, Actual Ship, Pred on Site, Arrival on Site Forecast) to be integrated from Smart Materials to Jovix in item shipments. (3700825)

  • Integrate Ident code details in Entity Name for "Material" events. (3709098)

  • Integrate the posted MRRs from Smart Materials to Jovix. (3621238)

  • JOVIX Windows service to fetch the values from project default and establish connection. (3583237)

  • Introduce a new project default value N for the project default ZI_JX_INT. This allows the PO data to be transferred to Jovix on PO approval but the ownership of PO is with Smart Materials. (3487607)

  • Integrate Location from Jovix to Smart Materials. (3506537)

  • Execute events from multiple projects in parallel in stagings table. (3539075)

  • Integration of MIR short description and description from Smart Materials to Jovix. (3669594)