You must specify the following DBA settings and project defaults to enable the Smart Materials EcoSys integration.
The following general DBA settings are applicable for the entire integration.
DBA Settings
|
DBA Setting |
Description |
Default Value |
|---|---|---|
|
ECO_PRODUCT_GROUP |
Defines the Product Group, whose projects data you want to integrate with EcoSys. |
- |
|
ECO_UNIT_GROUP |
Defines a unit group so that all the units present in the EcoSys gets integrated with Smart Materials. For example, currency is a unit present in EcoSys, to have same |
- |
The following DBA settings and project defaults are applicable for the account code integration.
DBA Settings
|
DBA Setting |
Description |
Default Value |
|---|---|---|
|
ECO_ACC_ATTR_SET |
It defines an attribute set which must be defined at Product Group level in |
- |
|
ECO_ACC_FREQ |
It defines the frequency (in hours) in which a scheduler runs and integrates
|
24 |
|
ECO_ACC_UK |
It defines an attribute set that must be defined at Product Group level in Smart Materials.
|
- |
Project Defaults
|
Project Default |
Description |
Default Value |
|---|---|---|
|
ZI_E_ACAPI |
Determines the EcoSys Account Codes resource name Sample format: {EcoSys API name}/?{EcoSys parameter}={ZI_E_PROJ} Example: ApprovedBudgetDetails/?Project={ZI_E_PROJ} |
- |
|
ZI_E_ACSER |
Manages EcoSys Account Codes integration with Smart Materials.
|
N |
|
ZI_E_ACSTR |
Determines the Smart Materials Account Code Structure name,
|
- |
In the EcoSys spreadsheet you can find the parameters required for an API as shown
in the picture below.