Issue Status - Intergraph Smart Materials - Version 2020 (10.0) - Training - Hexagon

Intergraph Smart Materials Classic Lab Tutorials (2020)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Training
Smart Materials/Smart Reference Data Version
2020 (10.0)

The issue status can be defined on the B.10.08 Issue Status screen.

The issue status can be considered a progress indicator or material history value. Example for an issue status definition:

Issue Status

Description

00

Estimation

10

Design 10% (state of engineering)

15

Design 50%

20

Issued for construction

50

As built

The issue status has a code, the sequence number, which must be in ascending order. The sequence number is used in the "Best Quantity" functionality.

If the Use on Site check box is checked, BOM positions must have this issue status to be selected during forecast or reservation runs.

The issue status is used on the B.20.01 Edit BOM and B.20.03 Adv. Maintain BOM screens to indicate the progress of material input in BOMs.