Inquiry - Intergraph Smart Materials - Version 10.2 - Help - Hexagon

Intergraph Smart Materials Classic Help

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
10.2

With the project default ZP_RDQTYCF, you control if the material available in the CWH and/or FIM shall be considered to reduce the quote quantity when creating inquiries. The inquiry in the picture below was created based on the requisition ZA-001-ADD shown in the picture above, using the Inquiry Cycle button on P.30.01 Requisition Workload.

All required quantities are available in the CWH or FIM warehouse, except 22.00 m of position 2. Thus, only this position 2 was assigned to the inquiry with a quantity of 22.00 m.

The needed CWH/FIM quantities are not reserved by the inquiry.