To be able to work with the open requisition interface, the project default for the currency must be set, and a status for production must have been defined on the R.10.11 Requisition Status screen.

Inserts and updates are only possible for requisitions that have not been approved so far.

Line items and any subsequent information such as attributes or account codes can only be inserted if the Pos Man indicator on R.10.41 Nodes and Templates is set. This indicator is only important for requisitions that are created by MTO. For all requisitions created manually (including this interface), this indicator is set automatically.

If the job is run in Insert Mode, requisitions and their line items will be used as references in case they already exist. Thus, you can insert requisition attributes, line items, or account codes, for example, even if the requisition itself or a line item has already been inserted.