Shipping Days - Intergraph Smart Materials - Version 10.1 - Help - Hexagon

Intergraph Smart Materials Classic Help

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Help
Smart Materials/Smart Reference Data Version
10.1

You can define the number of shipping days that are required to get material from one delivery place to another. This information about shipping days is needed for the commercial evaluation and is connected with the project default ZP_SITELOC, which represents the location of the construction site. The delivery place assigned to ZP_SITELOC is used for displaying the shipping days on the P.30.22 Commercial Evaluation and P.30.27 Bidder Quotation screens.

Depending on the incoterm, the delivery place of a quote detail may be a long way off from the actual construction site, nearby or even at the site itself. To be able to evaluate whether material will arrive on site on time, the number of days required for shipping it from the delivery place to the site is needed. The number of shipping days shown in the commercial evaluation is the one for the delivery place of the quote detail (Delivery Place from) and the site location assigned to the project default ZP_SITELOC (Delivery Place to).

Because the delivery place may also be a site itself, it is possible to create records with the same starting and ending delivery place and a number of shipping days of zero.

The shipping days can be specified on the P.10.38 Shipping Days screen.

Select the delivery starting point from the LOV in the Delivery Place from field and the delivery arrival point from the LOV in the Delivery Place to field. Then enter the number of days needed for shipping the material between the two delivery places in the Shipping Days field.