The C.20.05 Prepare MRR by Packages screen can be used to receive material by (multiple) packages.
After creating the MRR header as described in the Direct Receiving section, select the packages to be assigned to the MRR from the LOV in the Package Number field in the second (Packages) block. The item shipments assigned to the selected packages will be inserted automatically in the third (Inventory Receipts) block.
For the other field and button descriptions and how to post and unpost an MRR and how to create a revision, see Direct Receiving.