This DBA setting is used for Smart Materials - EcoSys Integration. It defines the frequency (in hours) in which a scheduler runs and integrates all the Account Codes of EcoSys into Smart Materials.
To start the scheduler, run "BEGIN m_pck_ecosys.import_ecosys_acc_codes; END".
-
Module(s) affected by this setting: J.10.01, J.10.02 and J.10.03
-
Valid Values: Any positive integer