This project default allows you to change the behavior of the Ref. Date field on the P.90.01 Load Fab Tracking screen.
If the project default is set to Y, this field is mandatory, and you must enter a value to save the job.
If the project default is set to N (which is the default value), the field is optional.
-
Module(s) affected by this setting: P9001
-
Default value: N
-
List of Values: N/Y