Indicator whether an order can be created directly for a requisition that requires a technical evaluation (without going through the inquiry cycle).

With this project default, you control whether an order can be created directly for a requisition that requires a technical evaluation.

If it is set to N (default), you can create an order for a requisition that requires a technical evaluation without going through the inquiry cycle. This means that the Create PO option on P.30.01 Requisition Workload will be available for such a requisition and this requisition will be available on P.50.01 Agreements and P.50.07 Maintain Agreements (add requisitions). The technical evaluation must then be performed later on, on P.50.07.

If you set this project default to Y, you cannot create directly an order for a requisition that requires a technical evaluation. The Create PO option on P.30.01 will not be available and the requisition will not be available on P.50.01 and P.50.07 as long as the technical evaluation has not been completed. You are forced to go through the inquiry cycle with this requisition to perform the technical evaluation before creating an order.

  • Module(s) affected by this setting: P3001, P5001, P5007

  • Default value: N

  • List of Values: N/Y