This project default sets the default increment between two positions on an engineering requisition. This value is used by the material take off (MTO). It is also used on screens R.30.01 and P.50.07 when line items are manually added.
-
Module(s) affected by this setting: OPI1001, P3005, P3022, P3027, P5007, R2001, R3001
-
Default value: ./.
-
List of Values: ./.