Smart Materials Project Defaults - Intergraph Smart Materials - Version 10.1 - Administration & Configuration - Hexagon

Intergraph Smart Materials Classic Administration (10.1)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
10.1

In many areas of Smart Materials, the software behavior and workflows are defined by parameter defaults for projects. Most modules in Smart Materials require the definition of specific settings, for example, the default list status that is assigned to the bill of material (BOM) positions in the B.20.01 - Edit BOM module. This section describes the required project default settings for a new project in Intergraph Smart Materials. Several definition levels are available.

Project defaults can be defined on the project group level, project level, or project/discipline level, as well as on the product group level. However, the product group is not handled much differently than a project.

This section describes all relevant project defaults and associated settings.