Revision Upgrade Example - Intergraph Smart Instrumentation - Help

Intergraph Smart Instrumentation Help

Language
English
Product
Intergraph Smart Instrumentation
Search by Category
Help
Smart Instrumentation Version
13.1

This example is based on the following parameters:

  • Initial numbering method: P0

  • Switch to numbering method for preliminary revisions: A

With the above parameters, the following results are obtained for subsequent revisions (on selecting Apply in the module sub folders of the Global Revisions dialog):

Previous

1

2

3

Comments

None

P0

A

B

First revision uses initial numbering method (P0); subsequent revisions use switch to numbering method (A, B, and so forth.)

P2

A

B

C

First and subsequent revisions use switch to numbering method (A, B, and so forth.)

A

B

C

D

Incremented by one step each time from the previous revision

B

C

D

E

Incremented by one step each time from the previous revision

1

2

3

4

Incremented by one step each time from the previous revision

2

3

4

5

Incremented by one step each time from the previous revision