This procedure explains how to upgrade two or more plants and their associated applications at the same time.
-
In the Plant to Upgrade pane, select two or more plants that needs to be upgraded.
-
Right-click and select Batch Upgrade.
For a list of all changes made during the batch upgrade, including the upgrade sub-tasks for each plant, see the batch upgrade log files. The log files, named BatchUpgradeV600_site name.log and BatchUpgradeV600_Details_site name.log, are saved in the folder where the .ini file resides.
From Smart Engineering Manager v12 HF6, you can run the batch upgrade in the command line.
Run Batch Upgrade Using a Command Line
-
Open a command prompt window.
-
Type the following command at the command prompt, and then press Enter on your keyboard.
"<Installation path for Smart Engineering Manager>\bin\SPUpgradeUtil43.exe" /Batch \\<Site Server path>.For example: "C:\Program Files (x86)\SmartPlant\Engineering Manager\bin\SPUpgradeUtil43.exe" /Batch \\ORACLE19_SERVER\AppOra\MySites\MySite1