Allows you to set the times for the scheduled backup. The options that appear on this page depend on whether you selected Daily, Weekly, or One time only on the previous scheduling page. See Scheduling Options (Site Server / Plant Structure Backup Wizard).

Start Time

Allows you to specify the time the scheduled backup will start on the selected dates.

Perform this task

Allows you to specify the frequency of the scheduled backup.

Every day

Performs the scheduled backup at the specified Start time each day from the Start date.

Weekdays

Performs the scheduled backup at the specified Start time each weekday from the Start date. Saturdays and Sundays are excluded from this schedule.

Every so many days

Performs the scheduled backup at the specified Start time at this number of days' interval from the Start date. For example, you can specify that the backup run every 4 days at Noon starting on May 28th.

  • You cannot view the details of a previously scheduled backup task from within Smart Engineering Manager. If you set up a scheduled event, such as backing up a particular plant at a given time, whether it be daily, weekly, or monthly, you cannot view that schedule within Smart Engineering Manager. In the Windows Control Panel, select the Scheduled Tasks option to see what events are scheduled. However, Scheduled Tasks indicates only that an event is scheduled, not what that event includes (such as whether it is backing up a plant or site).