Materials filters for 3D models or 2D drawings - Intergraph Smart Construction - 8 - Reference - Hexagon PPM

Intergraph Smart Construction Retired Feature Reference

Language
English
Product
Intergraph Smart Construction
Search by Category
Reference
Smart Construction Version
8

You can filter a 3D model or 2D drawing with Materials filters. When you filter a 3D model or 2D drawing with Materials filters, you can view Materials information related to 3D model or 2D drawing components and spools.

The following Materials filters are available for filtering:

Filter

Purpose

ETA greater than Required on Site

Indicates if materials are estimated to arrive at the site after the Required on Site (Req on Site) date.

ETA greater than IWP Planned Start

Indicates if materials are estimated to arrive after the Planned Start Date of the IWP package containing the materials.

Reserved

Displays model components that have been reserved in your external materials system.

Materials on Site

Displays components that have materials on site.

Materials with a Purchase Order

Displays components that have materials that are not on site but have a purchase order.

Insufficient quantity

Displays components that have an on-hand quantity of zero and a quantity less than the BOM quantity.

Tell me more about how these Materials filters work

The table below describes in more technical detail how the filters get their data from the Materials system.

Filter

Details (properties are from the Material system)

ETA greater than Required on Site

Compares the ETADate with the RequiredOnSiteDate for all tagged forecast materials on components that belong to the current model. Returns any materials with ETA dates past the ROS date.

ETA greater than IWP Planned Start

Compares the ETADate with the RequiredOnSiteDate for all tagged reserved materials on planned components that belong to the current model. Returns any materials with ETA dates past the ROS date.

Reserved

Returns all packaged components in the model that have a ReservedQuantity value greater than one.

Materials on Site

Returns all model components that have been assigned to a Warehouse and OnHandQuantity values greater than 0.

Materials with a Purchase Order

Returns all model components that have materials with an IIS value of "PO".

Insufficient quantity

Returns all model components that have an LPQuantity value greater than the value of OnHandQuantity.