Manage IWPs marked with an engineering change - Intergraph Smart Construction - Hotfix 14 - Help - Hexagon

Intergraph Smart Construction Help

Language
English
Product
Intergraph Smart Construction
Search by Category
Help
Smart Construction Version
8
SmartPlant Foundation / SDx Version
10

Smart Construction notifies you when a drawing or component in an IWP has changed. Users must acknowledge the revisions in order to clear the Engineering change notification on drawings and their IWPs.

An engineering flag notification displays when one of the following occurs:

  • A drawing associated with an IWP is revised and the drawing is assigned a new version and revision number. The drawing and IWP are marked with an Engineering change notification.

  • An engineering drawing has been superseded by a fabrication drawing. The drawing and IWP are marked with an Engineering change notification. You can then view the superseding fabrication drawing.

  • A component has changed or has been removed. The Components window is marked with an Engineering change notification. Individual components are marked with changes.

What do you want to do?