The following changes have been made to the Troubleshooting Guide.
Service Pack and Hot Fix Updates
-
Added a new message in the Hole Management To Do List messages. See No intersection is found between ‘Outfitting/Equipment Hole Aspect’ and ‘Structure(s)’. Please revise inputs. (P3 CP: 375004)
-
Updated Run database administration processes with the following:
-
Added information about the performance impacts when attaching and detaching large Reference 3D (R3D) models to a Smart 3D model in Project Management.
-
Added guidelines for when to stop the Smart 3D Rule Checker service before performing database intensive tasks.
-
Version 2019 (12.1)
-
Added information about deferring cable length and tray fill calculations. See Electrical. (P2 CP: 370519)
-
Added a new message in the Piping, HVAC, and Electrical To Do List messages. See Cable is out of date. Needs to be recomputed (see Cable is out of date. Needs to be recomputed). (P2 CP: 370519)