Create New WBS Project Dialog Box - Intergraph Smart 3D - Help

Intergraph Smart 3D Smart Interop

Language
English
Product
Intergraph Smart 3D
Search by Category
Help
Smart 3D Version
12.1 (2019)

Displays options for defining the properties of a new WBS project.

Type

Displays the project type.

Project Purpose

Specifies either As-built or Project. Only one as-built WBS project is allowed per model. You cannot change purpose of the project after you create the project. This list is defined by the WBSProjectPurpose codelist.

Project Status

Specifies the current project status. This list is defined by the WBSProjectStatus codelist.

WBS Parent

Identifies the higher-level object that is associated with the WBS item that you are creating. The WBS parent must be for a single project object or for another WBS object. You cannot change the parent after the WBS project has been created.

Name

Specifies a name for the project or renames it.

Correlation Status

Displays the correlation status assigned by the software. This value is read-only. The following table provides a description of the correlation statuses:

Status

Description

Correlated with data match

Represents objects that have a data match between the design basis data and the objects in the three-dimensional model.

Correlated with data mismatch

Represents objects that have a correlation with the design basis. However, these objects have a discrepancy, which generates the mismatch. The cause of the discrepancy can result from changes in the P&ID or the 3D model.

Correlated with approved data mismatch

Represents objects that have a correlation with the design basis. However, these objects have approved data discrepancies.

Correlated with approved topology mismatch

Represents objects that have a correlation with the design basis. However, these objects have approved topology discrepancy.

Not correlated yet

Objects that have either not been modeled from the P&ID or that have been modeled but have not been correlated with design basis data.

Ignored or not claimed (Project Management environment only)

Shows that the object either is not claimed (that is, it exists in the as-built condition), or that the software ignores the object (for example, revision clouds and labels).

Correlation Basis

Specifies if the object is correlated to a corresponding design basis. Select Correlate Object to associate the objects in three-dimensional model with the design basis. Select No correlation is required if the objects do not have a correlating design basis data.

Correlation Approval Status

Specifies if the component is approved with discrepancies in the three-dimensional data compared with design basis data. Select Topology mismatch approved if components topology mismatch can be ignored. Select Data and Topology mismatches approved if the components data and topology mismatches can be ignored. Select None if you do not want to approve a mismatch.