Lists the objects currently claimed in the SDx As-Built project and the allocated
project in the Smart 3D model so that you can determine the reason for the out of sync status. You open this
window by clicking Compare in the Project Operations dialog for an out of sync project.
SDx
Lists the objects currently claimed to the project in SDx.
S3D
Lists the objects currently claimed to the project in Smart 3D.
Object Type
Specifies the object type such as a pipe nozzle or an equipment.
Synchronization Type
Specifies the differentiation between the claimed objects in SDx and in Smart 3D.
Claimed
Indicates that the object is claimed in SDx and in Smart 3D.
To be Claimed
Indicates that the object is claimed in SDx but not in Smart 3D.
To be Released
Indicates that the object is released in SDx but not in Smart 3D.
To be Shared with SDx (New)
Indicates that the Smart 3D object is not synchronized to SDx.
To be Shared with SDx (Delete)
Indicates that the deleted Smart 3D object is not synchronized to SDx.
To be Deleted
Indicates that the object needs to be deleted in Smart 3D.
Export
Saves the list of claimed objects to a .csv file.
Close
Close the window and returns to the Project Operations dialog.