Copy a cableway run - Intergraph Smart 3D - Help

Intergraph Smart 3D Electrical

Language
English
Product
Intergraph Smart 3D
Subproduct
Electrical
Search by Category
Help
Smart 3D Version
11 (2016)
SmartPlant Foundation / SDx Version
10
  1. Click Select .

  2. Select Cableways in the Locate Filter box.

  3. Select the cableway run to copy.

  4. Click Edit > Copy.

  5. Select a reference point by clicking a point on the selected cableway.

  6. Click Edit > Paste.

  7. Select necessary options in the Paste dialog. To copy the clipboard contents on top of the existing copied objects, select the Paste in place option.

  8. If you selected the Paste in place option, select Move from the main ribbon.

  9. Identify a location in the model for the cableway run, and click in the graphic view to move the run to a new location.

If you position an end of the copied cableway run so that it touches a cableway run end or nozzle, the software automatically connects the two.