Route cableway with an offset - Intergraph Smart 3D - Help

Intergraph Smart 3D Electrical

Language
English
Product
Intergraph Smart 3D
Subproduct
Electrical
Search by Category
Help
Smart 3D Version
11 (2016)
SmartPlant Foundation / SDx Version
10
  1. Click Route Cableway .

  2. Select the run starting point.

  3. Define the cableway properties on the New Cableway dialog, and then click OK.

  4. From the Offset option, select Set Offset Reference to open the Set Offset Reference dialog.

  5. Select External for the offset type.

  6. Select a reference from which you want to measure the offset.

  7. Type the offset distance in the Offset box.

  8. Route the cableway as needed.