Tasks Menu - Intergraph Smart 3D - Help

Intergraph Smart 3D Common

Language
English
Product
Intergraph Smart 3D
Subproduct
Common
Search by Category
Help
Smart 3D Version
13.1

The software uses tasks to separate its user interface into discipline-specific user environments. Tasks are sets of commands focused on a particular engineering discipline, such as routing pipe or placing equipment. You usually need only a few of these tasks to accomplish your job. For example, if you are a piping designer, you probably only need to use the tasks that allow you to route pipe or create isometric drawings.

You define the tasks that appear on the Tasks menu by using the Configure Task List command. This command allows you to specify the tasks and the sequence you want them to appear on the Tasks menu. The software saves the selected tasks in the active workspace. Each workspace can display a different list of tasks on the Tasks menu. You can configure the Tasks menu for the workspace at any time.

To switch to a different task, click the task you want on the Tasks menu. When you activate a new task, the views remain unchanged, but the menu commands and tool bars are replaced by the new task. The software does not create new views of the model when you switch to another task. The Catalog, Systems and Specifications, and Project Management tasks do not have views of the model. Also, some tasks do not appear in the list if you did not install them.

When you are working with a Change Management model, the software checks for an active As-Built project each time that you switch between user environments. When one of the following situations exists, the software displays a message. For each message, you can select the Don't show this again check box to prevent future alerts even if no active project is set.

  • If there are As-Built projects available in the model but no active project is set, the software prompts you to set an active As-Built project. Setting an active project is mandatory before making design changes to a Change Management model.

  • If there are no As-Built projects available in the model, the software prompts you to synchronize the projects in SDx with Smart 3D and then set an active project. For information about synchronizing SDx projects with Smart 3D, see Project Operations.

For more information about working with a Change Management model, see the Project As-Built with HxGN SDx Help.