Verifying Drawings for Checkin Dialog Box - Intergraph Smart P&ID - 11.0 - Administration & Configuration - Intergraph

Intergraph Engineering and Schematics Projects Configuration and Reference

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
10
Smart P&ID Version
11
Smart Engineering Manager Version
12

Displays the progress of the version verification operation currently underway. This dialog box opens when you click Project > Verify for Checkin.

PPM All Outputs Graphic

Drawings

Lists the drawings that are being verified for checkin, and shows the status of that operation.

View Log

Opens the log file that is created by the verification process.