Verification Processes Performed During Check In - Intergraph Smart P&ID - 10.0 - Administration & Configuration - Intergraph

Intergraph Engineering and Schematics Projects Configuration and Reference

Language
English
Product
Intergraph Smart P&ID
Search by Category
Administration & Configuration
Smart Electrical Version
10
Smart P&ID Version
10
Smart Engineering Manager Version
11
  • All objects that exist in the project but don't exist in the Plant must be claimed.

  • All objects that exist in the Plant but don't exist in the project (that is, they were deleted) must have been claimed.

  • All objects that exist in both the Plant and the project must be identical if not claimed.

  • The claim state must be valid for the project.

  • If any claim on an object on this drawing is invalid then check in cannot occur.

  • The timestamp on all objects that exist in the project must be earlier than or equal to the timestamp on the drawing.

  • Last Publish Date > Drawing date.

  • Check In not allowed if Drawing is in a Re-create state.

  • The Verify for Checkin for new drawings should ensure that all items on the drawing have been claimed.