Before performing this scenario, ensure that you have completed all the prerequisite
activities described in Sample Project Workflows.
-
In Drawing Manager, select Project 1 and check out Drawing C from the Plant.
-
Open Drawing C.
-
Claim Flow Indicator FI-100.
-
Change the Tag Sequence Number of the Flow Indicator from 100 to 101.
-
Exit Drawing C.
Drawing C becomes Drawing C'.
-
In Project 2, fetch Drawing C from the Plant.
-
Open Drawing C.
-
Claim Flow Indicator FI-100.
-
Change the Tag Sequence Number of the Flow Indicator from 100 to 202.
-
Exit Drawing C.
Drawing C becomes Drawing C''.
-
In Project 1, delete Drawing C'.
-
In Project 2, check out Drawing C from the Plant without replacing the existing P&ID.
-
In Project 3, fetch Drawing C'' from Project 2.
-
Open Drawing C''.
-
Add a Generic Tray to the vessel.
-
Exit Drawing C''.
Drawing C'' becomes Drawing C'''.
-
In Project 2, undo the check-out of Drawing C''.
-
In Project 3, check out Drawing C from the Plant, ensuring that the existing P&ID is not replaced.
Drawing C becomes Drawing C''' in Project 3.
-
Open Drawing C'''.
-
Claim Flow Indicator FI-202.
-
Exit Drawing C'''.
Drawing C''' becomes Drawing C'''' in Project 3.
-
Check in Drawing C''''.
-
In Project 1, select Revisions > Fetch Deleted Drawing and select deleted Drawing C'.
-
Check out Drawing C'''' from the Plant, ensuring that the existing P&ID is not replaced.
Drawing C'''' becomes Drawing C' in Project 1.
-
Attempt to check in Drawing C'.
Unclaimed changes prevent check-in.
-
Open Drawing C'.
-
Claim the vessel.
-
Claim Flow Indicator FI-101.
-
Perform Compare and Refresh for the generic vessel tray.
-
Exit Drawing C'.
-
Check in Drawing C'.
Key
|
|
|
Fetch drawing |
|
Continuity between procedure steps (an arrow indicates changes to the drawing or to drawing item data) |
|
Check in drawing |
|
Check-in unsuccessful |
|
Undo drawing check-out |
|
Delete drawing |