Before performing this scenario, ensure that you have completed all the prerequisite
activities described in Sample Project Workflows.
-
In Project 1, check out Drawing A from the Plant.
-
Open Drawing A.
-
Claim Vessel V-100.
-
Find and replace Vessel V-100 with a 1 to 1 Parametric V Drum.
-
Exit Drawing A.
Drawing A becomes Drawing A'.
-
In Project 2, fetch Drawing A' from Project 1.
-
In Project 1, execute the Undo Checkout command on Drawing A', leaving Drawing A' in Project 1.
-
In Project 2, open Drawing A'.
-
Claim Nozzle N1.
-
Change the Tag Sequence Number of the nozzle to 4.
-
Exit Drawing A'.
Drawing A' becomes Drawing A''.
-
Check out Drawing A from the Plant to Project 2 without replacing the existing P&ID.
Drawing A becomes Drawing A''.
-
In Project 2, attempt to check in Drawing A''.
-
View the check in log file.
Unclaimed changes prevent check in.
-
Open Drawing A''.
-
Claim Vessel V-100.
-
Exit Drawing A''.
Drawing A'' becomes Drawing A'''.
-
Check in Drawing A''' with removal of the drawing from the project.
Key
|
|
|
Fetch drawing |
|
Continuity between procedure steps (an arrow indicates changes to the drawing or to drawing item data) |
|
Check in drawing |
|
Check-in unsuccessful |
|
Undo drawing check-out |