Before performing this scenario, ensure that you have completed all the prerequisite
activities described in Sample Project Workflows.
-
In Project 1, check out Drawing G.
-
Open Drawing G.
-
Claim the vessel, Nozzle N1, and the pipe run connected to the nozzle.
-
Delete from model the vessel and Nozzle N1.
-
Exit Drawing G.
Drawing G becomes Drawing G'.
-
In Project 2, create Drawing H.
-
In Project 3, create Drawing I.
-
In Project 2, fetch Drawing I from Project 3.
-
Open Drawing H.
-
Place 3 Piping Off Drawing OPCs (OPC1, OPC2, and OPC3), sending the partner OPCs to the Drawing I stockpile.
-
Make a note of the OPC tags.
-
Exit Drawing H.
Drawing H becomes Drawing H'.
-
Open Drawing I.
-
Place OPC3 into Drawing I from the Drawing I stockpile.
-
Exit Drawing I.
Drawing I becomes Drawing I'.
-
In Project 2, check in Drawing I', removing it from the project.
-
Fetch Drawing I' into Project 3 from the As-Built, overwriting the drawing.
-
In Project 3, open Drawing I'.
-
Claim OPC2 (in Drawing I stockpile).
-
Using the Move to Different Stockpile command, move OPC2 into the Project 3 Plant stockpile.
-
Exit Drawing I'.
Drawing I' becomes Drawing I''.
-
In Project 1, check in Drawing G'.
-
In Project 3, fetch Version 1 of Drawing G' from As-Built.
To fetch the correct version of Drawing G', do the following:
-
On the Fetch dialog, select History.
-
On the Version History dialog, select Version 1.
-
-
In Project 2, check in Drawing H', leaving the drawing in the project.
-
Open Drawing H'.
-
Claim OPC1, OPC2, and OPC3.
-
Exit Drawing H'.
Drawing H' becomes Drawing H''.
-
In Project 3, check in Drawing I''.
Key
|
|
|
Fetch drawing |
|
Continuity between procedure steps (an arrow indicates changes to the drawing or to drawing item data) |
|
Check in drawing |
|
Check-in unsuccessful |