The Scheduling tab provides information on how jobs are scheduled within the queue.
Run Limit
Limits the number of jobs that can be in the running (or transferring) state simultaneously. The allowable range of run limits is 1-60.
Intergraph Plant Design System (PDS) does not support a run limit greater than 1.
Multiprocessor Scheduling
On a multi-processor system, this option specifies the set of processors on which the queue is to reside. This can be overridden by the batch job itself. This value has no effect on a single-processor system. If no processor is selected, then all processors are used.