Manage Tasks in the SmartPlant Foundation To Do List - Integration - Update 44 - Help - Hexagon

Integration Help

Language
English
Product
Integration
Search by Category
Help
Smart 3D Version
12.1 (2019)
Smart Construction Version
2019(7.0)
SmartPlant Foundation / SDx Version
10
Smart Electrical Version
2019 (9.0)
Smart Materials/Smart Reference Data Version
2020 (10.0)
Smart P&ID Version
9 (2019)
Smart Review Version
2020 (15.0)
Smart Engineering Manager Version
10 (2019)
Smart Interop Publisher Version
13.1 (2019 R1)
Smart Isometrics Version
7.0(2019)
Spoolgen Version
9.0(2019)

In SmartPlant Foundation, the To Do List provides a place for you to view all workflow steps that have been assigned to you and their statuses. For example, when a workflow is attached to a SmartPlant Foundation object and your user name or role is assigned to a particular step in the workflow, the workflow step appears in your To Do List. Virtually all of your interaction with workflows in the Desktop Client occurs in the To Do List.

Depending on your SmartPlant Foundation configuration, the To Do List may be called the Inbox in the Desktop Client.

In the To Do List, you can view and complete checklists associated with workflow steps, complete voting steps, and update steps as completed or unable to complete.

Checklist items can be optional or required, depending on the way the workflow template was configured.

What do you want to do?