Import planned costs (periodic values) from SAP to EcoSys as transactions. These come from the SAP table COEJ (CO Line Items by Fiscal Year).
Job Details
-
Connect Job Name: SAP Planned Cost Line Items Import
-
Connect Job Action: ITG SAPC Planned Cost Line Items Import
Job Parameters
The parameters are specified in the EcoSys Connect Settings Maintenance screen under the "Default" SAP Import Group:
|
Parameter |
Default Value |
Description |
|---|---|---|
|
SAPVersion |
Specifies the VERSION value in SAP on which to filter. The default is to include all |
|
|
ValueMultiplier |
Sets to -1 if incoming revenue values are negative. |
|
|
CostElementRangeStart |
Cost Element range starts. |
|
|
CostElementRangeEnd |
Cost Element range ends. |
|
|
CostElementCategoryRangeStart |
Cost Element Category range starts. |
|
|
CostElementCategoryRangeEnd |
Cost Element Category range ends. |
|
|
CostElementRangeMatch |
Cost Element range matches (either INCLUDE or EXCLUDE), which determines the behavior for cost elements in the specified range. |
Deprecated Parameters from SAP Adapter
|
Job Parameter |
Description |
|---|---|
|
forecastType |
Use separated Connect jobs for different forecast types |
|
Version |
Now specified in the API spreadsheet row filter |
|
commitBatchSize |
No longer applicable |
|
costObjectExternalIds |
Use SAP Import or SAP Import Group instead |
|
costObjectCategories |
Use SAP Import or SAP Import Group instead |