-
Setup the EcoSys project as described in the Project Setup section.
-
Set the SAP Mapping Method on the EcoSys project to "Mapped".
-
The EcoSys cost object structure can be setup in any way desired for cost control. This can be manually created within EcoSys or imported from an external system.
-
It is only possible to map to cost objects which have the Cost Control Level set to "Yes".