This section discusses the flow of data from both Smart Materials to Jovix and from Jovix to Smart Materials. In Smart Materials, the MIR integration supports the following types:
-
MIR by Reservation
-
MIR by Direct Issue
-
MIR by BOM Commodity
-
Only MIRs of projects that have the project default ZI_JX_PROJ defined are integrated with the Jovix project.
-
MIR by Direct Issue is available for these versions only - 10.2SP11 onwards,10.3SP1 onwards and 10.4 onwards.
Data Mapping
The following table lists the data integration between Smart Materials and Jovix.
|
Smart Materials |
Jovix |
Description |
|
m_list_nodes.ln_code |
smatBom |
|
|
m_list_pos.lp_pos |
smatBomPosition |
|
|
m_inv_issues.iis_id |
smatMiriId |
|
|
m_inv_issues.issue_qty |
pickingTotalQuantity |
|
|
m_warehouses.wh_code |
plannedLocation |
|
|
m_matl_issue_rpt_nls.description |
description |
This is available for Smart Materials version 10.1 SP19, 10.2 SP9 and 10.3 and above. |
|
m_matl_issue_rpt_nls.short_desc |
shortDescription |
This is available for Smart Materials version 10.1 SP19, 10.2 SP9 and 10.3 and above. |